EasyManua.ls Logo

Jeco FCL022 - Assembly Instructions; Step 1: Hose Routing; Step 2: Pump Attachment; Step 3: Filling the Basin

Default Icon
3 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Current instructions at www.jeco-inc.com 1-800-893-3006 Page 2 of 3
To Assemble:
Step 1: Route the pre-assembled water hose on the top pot (A) to the bottom (B).
S
tep
2:
Carefully attach the pump (C) to the hose, making sure to place the pump in the
center of the bottom (B).
Step 3:
Fill the basin (B) with clean water, making sure the pump (C) is fully submerged.
Note: The maximum water level should be approximately 1.2 inches below the top edge of
the basin (B).

Related product manuals