EasyManua.ls Logo

Jet Ocean Pearls - Page 27

Jet Ocean Pearls
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Check Box When This Step is Complete
Step # 4-I
As Section # 3 is on the ground, ensure that the 5 Pin LED connector
on the LEFT side of the unit is properly plugged into the LED board and
seated properly. It will be difficult to reach this connection after the
unit is assembled.
Check Box When This Step is Complete
Step # 4-G
INSTALLATION INSTRUCTIONS
DO NOT allow the unit to sit or stand on the four bolts (as shown in
the picture to the right). This can cause the bolts to bend and not
allow the nuts to thread properly durin installation.
Check Box When This Step is Complete
Step # 4-H
As Section # 3 is on the ground, ensure that the 5 Pin LED connector
on the RIGHT side of the unit is properly plugged into the LED board
and seated properly. It will be difficult to reach this connection after
the unit is assembled.