1. Insert the straight end of the latch between the knockouts
furthest from the corner.
2. Using a moderate amount of pressure, force the latch over
the third knockout.
3. The latch installation should now be complete. The latch
should now be “trapped” within the three (3) knockouts.

4. Repeat the latch installation with the remaining latches. 
 .
After the latches have been installed, the frame should be
congured like that shown in Figure 45.




5 Insert the rigid DH lter into the frame. While holding the
lter in the frame, grasp the loop on the end of the latch and
pull it until it stretches over the header and rests into the pre-
drilled hole in the header of the lter (see Figure 46). Repeat
this with the remaining latches.
6. The lter should now be securely installed into the frame.









