Operating manual - SAB 120-151 A-frame (including ATEX)
008668 en 2019.08
29/61
Operating instructions
6.2 Principle P&I diagram
Delivered and installed by customer:
* Strainer with mesh = 500µm to be
installed in water line
* Valves for CIP cleaning recommended.
* Additional part ow ltration is
recommended for particle rich waters.
4809-053_Rev_5
Fig. 11: Principle P&I diagram, SAB 120/151. SAB 151 with OHU 04123 oil separator is shown here.