14. Evacuate and charge with refrigerant. Refer to Operation and maintenance (Form 160.75-
O1.EN.CE).
15. Complete installation and finally level the unit according to the Installation guide (Form 160.75-
N1.EN.CE).
Figure 4: Rigging – compressor and motor assembly
Note: Rig the driveline into place on the chiller, supporting the compressor with two lifting lugs and
the motor with either, one, two, or four legs depending on motor design.
13Model YK (Style G) Chiller Field Reassembly for Form 3 and Form 7