EasyManua.ls Logo

JR Vibe 90 3D - Assembly Process - Washout Unit

JR Vibe 90 3D
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
69
P-1
ASSEMBLY PROCESS – MAIN ROTOR HEAD 1
P-2
ASSEMBLY PROCESS – MAIN ROTOR HEAD 2
Control Ball, 14 mm
Control Ball, 14mm (2 pcs)
..2 pcs
Bearing, 8 x 16 x 5 mm
Bearing, 8 x 16 x 5 mm (4 pcs)
Main Blade Holder
.....................4 pcs
Use caution when inserting the
main blade holder bearings so
as not to distort/damage the
main blade holders.
Make two main blade holders.
TEAM TIP: JB Weld the bearings into the blade
holders to reduce play in the blade holders.
2 pcs
Thrust Bearing, 8 x 16 x 5 mm
Thrust Bearing, 8 x 16 x 5 mm (2 pcs)
..............2 pcs
Spindle Washer (Black)
...................2 pcs
Blade Holder Spacer (Silver)
...................2 pcs
Washer, 12 x 16 x 0.5 mm
..................2 pcs
Socket Head Bolt, 5 x 10 mm
Socket Head Bolt, 5 x 10 mm (2 pcs)
..........2 pcs
Blade Dampener O-Ring (#50)
..........4 pcs
Head Spacer
...................4 pcs
Spindle Washer (Black) (2 pcs)
Blade Holder
Spacer (Silver)(2 pcs)
Head Spacer (4 pcs
)
Blade Spindle Shaft
Blade Dampener O-rings (4 pcs)
(check after approx. 30-50
flights and replace as needed)
Washer, 12 x 16 x 0.5 mm (2 pcs)
Large I.D.
Small I.D.
Be sure to note correct
placement of
large/small I.D. thrust
washers during
assembly.
Re
d
Use Red
Threadlock
Grease thrust bearings
before assembly
Grease thrust bearings
during assembly to prolong life

Table of Contents

Related product manuals