EasyManua.ls Logo

JR Vibe 90SG - Tail Drive Shaft Assembly; Tail Boom Installation

JR Vibe 90SG
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
Flat Washer, 3mm (4pcs)
Socket Head Bolt, 3 x 40mm (4pcs)
Nylon Lock Nut, 3mm (4pcs)
270mm
Drive Shaft Collar (2pcs)
Setscrew, 3 x 6mm (2pcs)
Tail Drive Shaft
neerG )2x(
It is very important that the guide
bearing be attached to the shaft o
center as shown to prevent resonance,
vibration and fatigue.
5-1 TAI L D R I VE S H A FT ASSEMBLY
5-2 TAIL BOOM INSTALLATION
Setscrew, 3 x 6mm (2pcs)
Socket Head Bolt, 3 x 40mm (4pcs)
Nylon Lock Nut, 3mm (4pcs)
Flat Washer, 3mm (4pcs)
Tail Boom
Tail Boom Holder
Shaft Drive Guide (2pcs)
Bearing,
8 x 14 x 4mm (2pcs)
Oil
Apply oil to the inside of the Tail Boom,
then install the Shaft Drive Guide.
Attach the bearing rst.
neerG
(x2)
250mm
Do not apply threadlock to the inside
of the ball bearings.
Button Head Bolt,
3 x 4mm (4pcs)
Drive Shaft Insert (2pcs)
Drive Shaft Pin (2pcs)
Button Head Bolt, 3 x 4mm (4pcs)
Drive Shaft Collar (2pcs)
Drive Shaft Pin (2pcs)
)4x(
deR
Red
(x2)
Note: Install tail boom pipe rst,
then slide drive shaft into place
second.Ensuretorquetube
engagement into the tail drive
transmission output.
Note: Do not over-tighten
M3x40mm bolts and tail
boom clamps. The gap of the
boom clamp holder and tail
transmission case do not need to
be fully closed” when tightening
these bolts.

Table of Contents

Related product manuals