EasyManua.ls Logo

JR Vibe 90SG - Tail Gear Case Installation 2

JR Vibe 90SG
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
Flat Washer, 3mm (2pcs)
Vertical Fin
Button Head Bolt, 3 x 6mm (2pcs)
Position the vertical n so that it is
perpendicular to the building surface
(parallel with the main rotor shaft) and
tighten the tail gear case clamp bolt
from the previous step.
5-4 TAI L G E A R CA SE INST A LL A T I ON 2
Button Head Bolt, 3 x 6mm (2pcs)
Flat Washer, 3mm (2pcs)
Button Head Bolt, 3 x 4mm (1pc)
Socket Head Bolt, 3 x 10mm (1pc)
Button Head Bolt, 3 x 4mm
Socket Head Bolt, 3 x 10mm
deR
deR
)2x(
deR
Position the vertical n so that it is
perpendicular to the building surface (parallel
with the main rotor shaft) and tighten the tail
gear case clamp bolt from the previous step.
Do not over-tighten and deform the clamp.

Table of Contents

Related product manuals