1. Close the 1/4” check port valve under the
nozzle isolation valve (1).
2. Open the isolation valve (2) by turning the
handle counterclockwise.
3. Push the nozzle to the process (3).
4. Attach the nozzle to the nozzle guide with one
special M5x10 screw (4) using a 5mm allen key.
5. Lock the isolation valve handle with the safety
pin (5).
Nozzle insertion