Front, Rear, Left, and Right
The front, rear, left, and right of the machine
indicated in this manual are based on the status
sitting in the driver seat, with the bulldozing
blade visible in the front.
0-3
Designated Operations
This machine is mainly applied for following
operations:
● Digging
● Ditching
● Side ditching
● Leveling
● Loading
Product Features
● Small size, flexible operation
● Can be equipped with a variety of
attachments
● Track width "flexible machine width
structure"
Run-in period
For the first 100 hours of the new machine (as
indicated by the timer), please follow the
instructions below:
Using the new machine without run-in will
deteriorate acceleration performance and
probably shorten the life of machine.
● Sufficiently warm up the engine and
hydraulic oil.
● Avoid heavy-load and rapid operations.
Maintain the load at approximately 80% of
maximum load capacity during operations.
● Do not start, accelerate, steer, or stop
suddenly, unless it’s really necessary.
Front
Left Right
Rear
Introduction