EasyManua.ls Logo

Kioti NX5510 - REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT (WITH PTO SHAFT)

Kioti NX5510
266 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
-
3
6
-
2
3-POINT HITCH IMPLEMENT OPERATIONNX4510/NX5010/NX5510/NX6010
6
-
3
6
-
2
3-POINT HITCH IMPLEMENT OPERATIONNX4510/NX5010/NX5510/NX6010
REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT (WITH PTO SHAFT)
1. Place implement on the level
ground.
2. Drive the tractor backward to move
as close as possible to an imple-
ment. (approx. 5 cm)
Then, adjust the height of the low-
er link to be parallel to the pins of
the implement.
3. Put all the shift levers in the neu-
tral position.
(1) Implement Support (2) Lower Link (1) Check Link Pin
4. Remove the pins on either side of
the check link.
5. Remove the ball assembly by
pushing the guide pin operating
lever.
(1) Lever (2) Ball Assembly
A40O607A A40O612AA40O613A
TE120(NX4510,5010,5510)CABIN,ROP2 2 2014-03-27 오후 3:22:22

Table of Contents

Related product manuals