EasyManua.ls Logo

Kipor SINEMASTER IG1000 - AC Application Procedure; Overloading Generator Cautions

Kipor SINEMASTER IG1000
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
AC application
1. Start the engine and make sure only the output indicator light (green) comes on.
2. Confirm that the appliance to be used is switched off, and plug in the appliance.
Substantial overloading that continuously lights the overload indicator light (red) may damage
the generator. Marginal overloading that temporarily lights the overload indicator light (red)
may shorten the service life of the generator.
Be sure that all appliances are in good working order before connecting them to the generator.
If an appliance begins to operate abnormally, becomes sluggish, or stops suddenly, turn off
the generator engine switch immediately. Disconnect the appliance and examine it for signs
of malfunction.
3. In order to insure the optimum output and the maximum service life of the generator, the
generator should run at a 50% load for the first 20 hours.
overload indicator
light
output indicator
light
plug

Related product manuals