Install the Piping (cont.)
Install 1/2 copper pipe from each union to the steam head housings assembly installation locations.
Install a 1/2 NPT connection elbow on the end of each steam housing assembly.
Secure the connections to the framing whenever possible.
NOTE: The steam generator(s) will not operate without water and a connected user interface control.
4. Install the Steam Head
NOTE: Follow the instructions packed with your steam head kit.
1060226-2-E 10 Kohler Co.

Other manuals for Kohler K-1695

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler K-1695 and is the answer not in the manual?

Kohler K-1695 Specifications

General IconGeneral
BrandKohler
ModelK-1695
CategoryIron
LanguageEnglish

Related product manuals