119
SM
T
V
R
U
X
S
R
P
A
C
B
F
E
L G H
M
Q
P N
M
Fig. 9.60
Fig. 9.61
Fig. 9.62
Fig. 9.63
ED0053030410
ASSEMBLY INFORMATION
9.10.2 Coolant pump
Important
• Always replace the gasket L every time it is assembled.
1 - Secure the flange G with the screws H interposing the
gasket L onto the crankcase M (tightening torque of 25
Nm).
2 - Perform the operations 1 and 2 of Par. 6.2.2.
9.10 Coolant circuit assembly
9.10.1 Thermostatic valve
Important
• Always replace the gasket A after each assembly.
1 - Check the condition of the seal gasket A and fit it on the
thermostatic valve B.
2 - Position the thermostatic valve B in the seat on the head C
(detail D).
3 - Secure the cover E with the screws F on the head C
(tightening torque of 10 Nm).
9.10.3 Oil Cooler hoses
1 - Secure hose N on Oil Cooler P and on crankcase M by
means of clamps Q.
2 - Position and secure hose R by means of clamp S on Oil
Cooler P and on crankcase M.
3
- Secure clamps T on manifold U by means of capscrews V
in points X (tightening torque 10 Nm - ST_06)..