EasyManua.ls Logo

Kohler VEIL K-5402A-0 - Remote Control Docking Station Setup; Docking Station Mounting and Securing; Anti-Theft Installation Features

Kohler VEIL K-5402A-0
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1266554-A02-A23
Fig.#51
NOTE: Use suitable mounting methods for the wall construction material. Special fixings may be required for
walls made of plasterboard.
NOTE: Do not install this appliance in positions where it might come in contact with water.
1. Select a proper position for the control docking station to be installed. The position shall be easily operated by
the user when seated on the toilet.
2. Based on the docking station hole positions, drill two 6mm diameter holes, 45mm deep.
3. Insert lag bolt anchors into the holes.
4. Remove the double-sided tape and place docking station over the fixing holes.
5. Fasten docking station with screws and place bushing on the bolts.
6. Place remote control on the docking station.
Kohler Co. March 2016

Related product manuals