VII - 10
Working with the Big Pack Baler
7.8.3 Initiate the Tying Process Manually
For the tying twine to reach the baling channel and be
grasped by the knotter, the tying process must be
triggered manually.
To do this:
• Swivel the safety lever (2) down.
With mechanical triggering:
• Move the lever (1) up to trigger the tying process.
With electrical triggering (optional):
• Move the lever (3) back to trigger the tying process.
Then move the needles upward to the knotter and back
manually on the flywheel (in the working direction) or by
turning on the PTO. The tying twine is now in the baling
channel.
In the case of the single knotter, make
certain that the twines are pulled back
after the last tie. Otherwise the thread
may unravel the next time a knot is tied.
BP380-7-051
2
1
BPXC0230
2
3