EasyManua.ls Logo

Krone Comprima F 155 XC - 11.23 Removing the Crop Blockages in the Crop Collection Area

Krone Comprima F 155 XC
234 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IX - 9
Maintenance
9.3.3 Maintenance at specified intervals
oil change
check
adjust
bleed
tighten
after initial 8 operating hours wheels, wheel nuts x
and after every wheel changel
after extended PTO shaft slip clutch x
downtimes (friction clutch only)
after the first 500 bales, screws from the
then every 3000 bales, floor conveyor x
but at least once a year
at the beginning of the season chain tension:
(after approx. 5 bales) floor conveyor xx
floor conveyor drive xx
pick-up drive xx
chain tension:
roller drive xx
pick-up drive xx
after first time use
(approx. 30 - 50 operating hours)
then annually after
every season
gearbox x
after the Floor conveyor tension xx
first operations, F 125/F 125 XC
then after every 1000 bales
Intervals Machine
component
check
refer to
cap. Main-
tenance

Table of Contents

Other manuals for Krone Comprima F 155 XC

Related product manuals