Operation
64
Pos: 27.32 /BA/Einste llungen/Schwader/ Zinkenarme/Hin weis durch die Vorspannkr aft 20 kg Handkraft aufbri ngen um Bolzen ziehen zu kö nnen @ 39\mod_126874502019 6_78.docx @ 361246 @ @ 1
Note
When swivelling the tine arms into transport position, a manual force of 20 kg has to be applied
by the use of preload force (via assembled disc springs) in order to be able to remove the bolt
(2) (see chapter Settings “Disc springs at collapsible tine arms).
Pos: 27.33 /BA/--- ------------ Seitenumbruch------ ---------- @ 0\mod_119617 5311226_0.doc x @ 4165 @ @ 1