3-54
Maintenance > Parts Replacement
28
Move the lever for retard pressure to the original position.
29
Attach the right rail bracket, and fasten each two screws on
right and left side of horizontal conveying upper guide..
30
Attach the feed roller drive assy.
Tilt the unit slightly to the right when viewed from the front of the main unit, and then hook it.
31
Fasten a screw on each side of the rail of deck feed unit.
32
Move the deck feed unit to its original position.
33
Turn the lock lever to its original position.
34
Return the Cassette 2 and 3 to its original position, and close
Front Covers 2 and 4.
When attaching Cassette 3 or 4, accommodate the rails inside the main unit beforehand so
that it does not slip from the rail.
Make sure that attached shaft is on the position shown below.