BE ADVISED:
IT IS MOST IMPORTANT THAT THE USER FOLLOW INSTALLATION
INSTRUCTIONS EXACTLY AS WRITTEN—FAILURE TO DO SO IS LIKELY TO
LEAD TO IMPROPER OPERATION, ERRONEOUS CALIBRATIONS AND
POSSIBLE DAMAGE TO THE EQUIPMENT. UNDER NO CIRCUMSTANCES
SHOULD THE USER ATTEMPT OPERATION WITHOUT THIS INFORMATION.
THE FOLLOWING EQUIPMENT IS TO BE SUPPLIED BY THE USER:
Dry CO
2 gas (research grade or better).
A dual-stage regulator for the CO2 tank.
¼" ID Flexible tubing (appropriate length from tank to incubators), and
connected per local codes.
Fyrite or similar chemical-based CO2 analyzer.
BE ADVISED: INSTALLATION AND PRE-OPERATION PROCEDURE WILL
TAKE AT LEAST 24 HOURS TO COMPLETE. DO NOT ATTEMPT TO RUSH
THE PROCESS WITH SHORT CUTS TO THE PROCEDURES DESCRIBED IN
THIS MANUAL.