EasyManua.ls Logo

LaCimbali Q10 New Touch - Installation Check-up

LaCimbali Q10 New Touch
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
These chapters in the manual are to be used by qualified, authorized technical staff.
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
5. Installation Check-up
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
COFFEE CIRCUIT / MILK CIRCUIT / SOLUBLES CIRCUIT
Press the PRG (29)
key and then the icon ; choose the type of wash cycle, and follow the instructions on the touch
screen.
HOT WATER
Continuously dispense hot water
until at least 0.5 liters of water have been dispensed
.
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
54
English

Table of Contents

Related product manuals