EasyManua.ls Logo

Lander RAFALE-M - Landing Gear Installation and Checks

Lander RAFALE-M
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 10 -
Link up the front steering push rod.
Link up the rudder push rod.
Double check the rudder push rod is able linked up with
the front steering servo which has been operated the rudder
and front steering together.
Batteries sitting area and tight up with magic tape during
on flight.
Remarks: Pls be noticed that two batteries must be
same quality and fully charged before take off. Since
our setting of two batteries are used parallel methods
for power supply.
Front nose retractable landing gear parts
Pls be reminded to install the dummy plastic leg cover
(Strut) for reinforcement purpose
Main retractable landing gear parts
Pls be reminded to install the dummy plastic leg cover
(Strut) for reinforcement purpose

Related product manuals