EasyManua.ls Logo

LAVAZZA ESPRESSO POINT MATINEE - Installation

LAVAZZA ESPRESSO POINT MATINEE
43 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
INSTALLATION
Position the machine on a flat, horizontal surface. Remove the access lid from the tank
compartment and fill the tank with mains, drinking water (fig.1).
Power the machine by connecting its lead with the electrical outlet (fig. 2).
Move the switch to position 1 (fig. 3).
The light with voltage symbol in the top left-hand corner of the front will turn on
showing the machine is connected.
The lower light is off; it flashes when the level of water in the tank is too low.
After about two minutes the selection lights on the right-hand side of the front will turn
on indicating the operating temperature has been reached.
Fig. 1
Fig. 2 Fig. 3
GB
Only components that operate at mains voltage are fitted to the machine. For this reason
NEVER remove the machine’s outer casing or carry out repairs. Repairs must only be
performed by a qualified engineer.
1) Flat, stable horizontal support surface.
To work properly, the “Espresso Point Matinée” machine needs to be positioned on a
sufficiently stable horizontal surface so as not to allow it to tip up or fall accidentally.
2) Good air circulation.
The “Espresso Point Matinée” machine gets very hot so it must therefore be
positioned in a large enough space to allow sufficient air circulation.
The “Espresso Point Matinée” machine is designed to function at 230V.
NEVER insert the machine’s power plug into a socket with a different voltage.
The socket used must have an “earth” connection.
Matinee 230V Ed.11:MATINEE 9-03-2010 18:32 Pagina 11

Related product manuals