EasyManua.ls Logo

LAVAZZA FLAVIA CREATION 600 - Regulatory Compliance and Testing

LAVAZZA FLAVIA CREATION 600
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER GUIDE | 7
Water to be cold drinking water and sodium-free. Sodium-free water
is especially important in buildings using sodium-softened water.
Install in accordance with local plumbing regulations.
Jointing compound should not be used in the water supply to the
brewer, as this will aect the drink avor. Only use PTFE tape.
Do not locate the water supply above the mains power socket.
REGULATORY COMPLIANCE
This brewer has been designed and manufactured in compliance with the
relevant regulatory compliance requirements for your market.
PORTABLE APPLIANCE TESTING
We recommend that the following tests are performed on the system on an
annual basis by a suitably trained person using a Portable Appliance Tester
following the manufacturer’s instructions.
TEST: RECOMMENDED LEVEL:
Earth Bond Test Less than 0.1Ω (including mains lead)
Insulation Resistance Greater than 2MΩ
WARNING
The mains plug lead and socket should be checked weekly for any
signs of damage.
All test results should be recorded and retained for future reference
including the date performed, who performed them and the next test
date.
If any test or inspection fails do not connect the system.
Call customer service or your local FLAVIA® supplier immediately.

Related product manuals