EasyManuals Logo

Lennox KCC120S4M User Manual

Lennox KCC120S4M
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
Page 48
Sequence of Operation - EHA 7.5, 15, 22.5, 30, 45, 60 kW - Y and G, J, M
NOTE: This sequence of operation is for all Electric Heat
kW ratings Y through J voltages. Each step of operation
is numbered and can be followed in sequence on the di-
agrams. Operation for G, J, and M voltages will be the
same.
HEATING ELEMENTS:
1 - Terminal Strip TB3 is energized when the unit
disconnect closes. TB3 supplies line voltage to
electric heat elements HE1 through HE6. Each

FIRST STAGE HEAT:
2 - Heating demand initiates at W1 in thermostat.
3 - 24VAC W1 signal is routed from the thermostat



4 -  
       
        
energized.
SECOND STAGE HEAT:
 Heating demand initiates at W2 in thermostat.
6 - 24VAC W2 signal is routed from the thermostat
through TB1 and P2-7. Electric heat contactor K16
is energized.
7 - 

HE3 and HE4 electric heat is energized.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox KCC120S4M and is the answer not in the manual?

Lennox KCC120S4M Specifications

General IconGeneral
BrandLennox
ModelKCC120S4M
CategoryAir Conditioner
LanguageEnglish

Related product manuals