Figure 133. Screws removal
Step 4. Remove the front operator panel by pulling it out from the server.
Figure 134. Front operator panel removal
Step 5. Remove the six screws that secure the LOM package.
Figure 135. LOM package removal
126 ThinkSystem SE350 and ThinkSystem SE350 Enclosures Maintenance Manual