• “Safety” on page iii
• “Installation Guidelines” on page 37
2. Turn off the server. Disconnect the power cords and all external cables (see “Power off the server” on
page 16
).
3. Remove the node from the enclosure if needed (see
“Remove a node” on page 98).
4. Remove the M.2 WLAN/LTE wireless adapter if installed (see
“Remove the M.2 WLAN/LTE wireless
adapter” on page 41
).
5. Remove the lock position switch if installed (see
“Remove the lock position switch” on page 75).
To remove the front operator panel, complete the following steps:
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
DkEpH4SzvKZck4f6rVRzUE
.
Step 1. Carefully remove the cable from the metal pull tab holder.
Step 2. Carefully press the cable latches and disconnect the two Y-cable connectors.
Step 3. Remove the screw.
Step 4. Pull the release tab.
Step 5. Slide the front operator panel out of the server.
Figure 53. Front operator panel removal
If you are instructed to return the defective component, please package the part to prevent any shipping
damage. Reuse the packaging the new part arrived in and follow all packaging instructions.
Install the front operator panel
Use this information to install the front operator panel.
Before you install the front operator panel, complete the following steps:
1. Read the following sections to ensure that you work safely.
• “Safety” on page iii
• “Installation Guidelines” on page 37
2. Turn off the server. Disconnect the power cords and all external cables (see “Power off the server” on
page 16
).
To install the front operator panel, complete the following steps:
68
ThinkSystem SE350 and ThinkSystem SE350 Enclosures Maintenance Manual