Attention:
• Read
“Installation Guidelines” on page 55 and “Safety inspection checklist” on page 56 to ensure that you
work safely.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
BmyijyY0-lNvapM4fTV5Gf
.
Procedure
Step 1. Remove the OCP module.
Figure 109. Removing the rear OCP module
Figure 110. Removing the front OCP module
150 ThinkSystem SR650 V3 User Guide