EasyManua.ls Logo

Lenze 8400 BaseLine C - Communication Phases;Network Management

Lenze 8400 BaseLine C
342 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lenze · 8400 BaseLine C · Reference manual · DMS 1.6 EN · 01/2014 · TD05 179
9 System bus "CAN on board"
9.5 Communication phases/network management
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
9.5 Communication phases/network management
Regarding communication via the system bus, the controller distinguishes between the following
statuses:
Tip!
Part of the initialisation or the entire initialisation can be carried out anew in every status
by transferring the corresponding network management telegrams.
Status Explanation
"Initialisation"
(Initialisation)
After switch-on, an initialisation run is carried out.
During this phase, the controller is not involved in the data exchange via
the bus.
The standard values are re-written to all CAN-relevant parameters.
After initialisation is completed, the controller is automatically set to the
"Pre-Operational" status.
"Pre-Operational"
(before being ready for operation)
Parameter data can be received, process data are ignored.
"Operational"
(ready for operation)
Parameter data and process data can be received!
"Stopped"
(stopped)
Only network management telegrams can be received.
Communication object Initialisation Pre-Operational Operational Stopped
PDO
SDO 
Sync 
Emergency 
Boot-up
Network management (NMT) 

Table of Contents

Other manuals for Lenze 8400 BaseLine C

Related product manuals