Informaon on project planning
Project planning process
Dimensioning
3 methods for dimensioning
Fast: Selecon of the inverter based on the motor data of a 4-pole asynchronous motor.
Detailed: In order to opmise the selecon of the inverter and all drive components, it is
worth to execute the detailed system dimensioning based on the physical requirements of the
applicaon. For this purpose, Lenze provides the «Drive Soluon Designer» (DSD) design pro-
gram.
Manual: The following chapter guides you step by step to the selecon of a drive system.
Workow of a conguraon process
Dene required input variable
Calculate range of adjustment and determine rated point
Determine motor based on the rated data
Dene correcon factors for the inverter
Determine inverter based on the rated data
Check motor/inverter combinaon
Determine brake resistance
Final conguraon
Dene required input variables
Operang mode S1 or S6
Max. load torque M
L,max
Nm
Max. load speed n
L,max
rpm
Min. load speed n
L,min
rpm
Site altude H m
Temperature in the control cabinet T
U
°C
Informaon on project planning
27