Acceptance
The machine manufacturer must check and prove the operability of the safety funcons used.
The machine manuf
acturer must authorise a person with experse and knowledge of the
safety funcons to carry out the test.
The test result of every safety funcon must be documented and signed by the inspector.
A complete test comprises the following:
Documenng the plan
t including the safety funcons:
Creang an overview screen of the plant.
Describing the plant.
Describing the safety equipment.
Documenng the safety funcons used.
Checking the funcon of the safety funcons used.
Preparing the test report:
Documenng the funconal test.
Checking the parameters.
Signing the test report.
Preparing the appendix with test records:
Protocols for the plant
External recording
The tester must repeat the test aer each chang
e and record the results in the
test report.
Periodic inspecons
Check the oper
aonal ow of the safety-related funcons at regular intervals. The risk analysis
or prevailing regulaons determine the me intervals between the inspecons.
Device exchange
Exchange a maximum of one safe device before recommissioning.
How to replace a safe device:
1.Check the compability of the devices.
2.Set the safety address.
3.Carry out a funconal test.
For double axes, ensure that the safe parameter sets are assigned to the correct
a
xes.
Funconal sa
fety
Acceptance
151