EasyManua.ls Logo

LEYBOLD TRIVAC D 16 B-DOT - Remounting the Pump Module

LEYBOLD TRIVAC D 16 B-DOT
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41GA01208_002_C0 - 11/2016 - © Leybold
After removing the protective shipping materials, handle the new pump
module with care.
Before installing a new pump module, remove the four tie rods from the new
module and insert them in the old one for protection during shipment.
5.9.2 Remounting the Pump Module
When installing a new pump module, it is also advisable to use a new gasket
(14/4).
Check the coupling element (14/5) for damage; if necessary, install a new
one.
Use the tie rods supplied with the new pump module only if the old ones are
damaged. To do so, unscrew the old tie rods with lock nuts, and screw in
the new ones. With the aid of the lock nuts, tighten the tie rods. Then remove
the lock nuts.
Before installing the pump module, please check wether the washer (14/3) is
correctly seated in its opening.
Push the gasket (14/4) onto the tie rods (14/6), push the coupling element
(14/5) onto one coupling half.
Push the entire pump module (new or repaired) onto the tie rods.
Screw on the hex. nuts (14/1) and carefully cross-tighten them (17.5 Nm
for the D 40 B and 10 Nm for the D 16/25 B.)
Mount the oil case together with the gasket (see Chapter 5.6).
Fill in oil.
Maintenance
NOTICE

Related product manuals