EasyManua.ls Logo

LG LB-G3680HL - Drain Piping and Test Running

LG LB-G3680HL
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 26 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Ceiling
CAUTION
1~3mm
Drainage hole
Drainage hole
U-Trap
B
C
A 70mm
B 2C
C 2 x SP
SP = External Pressure
(mmAq)
Ex) External Pressure
= 10mmAq
A 70mm
B 40mm
C 20mm
A
Make sure to be closed.
Unit
Drainage pipe
(Local supply)
Thermal insulator
(Local supply)
Drainage hole
CAUTION FOR GRADIENT OF
UNIT AND DRAIN PIPING
Lay the drain hose with a downware
inclination so water will drain out.
700mm
(HP/CP model only)
Front of view
Always lay the drain with downward inclination
(1/50 to 1/100).
Prevent any upward flow or reverse flow in any part.
5mm or thicker formed thermal insulator shall
always be provided for the drain pipe.
1. Install declination of the indoor unit is very important for the drain of the duct type air conditioner.
2. Minimum thickness of the insulation for the connecting pipe shall be 5mm.
The unit must be horizontal or declined to the drain hose connected when finished installation.
CORRECT
INCORRECT
Upward routing not
allowed
Applied U-Trap Dimension
Install the P-Trap (or U-Trap) to prevent
a water leakage caused by the blocking
of intake air filter.
INCORRECT
CORRECT

Related product manuals