EasyManua.ls Logo

LG LP093CD3B - Page 31

LG LP093CD3B
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 31 -
Copyright ©2012 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
14. Connect the condensate pump to the ICR relay of
the terminal of the board as shown in Figure 32 &
34 whichever is applicable Make sure to fasten the
pump wire through the wire clip on the back side of
the control barrier as shown in Figure 33.
15. Assembly the unit back following the reverse order
of disassembly.
NOTE: All tube should be inserted into rubber elbows
by at least 1/2"
Figure 31
Pump
assembly
Tube #1
Tube #2
Rubber
elbows(3)
Spraying
Tube
Figure 33
Figure 32
BL BL

Related product manuals