EasyManua.ls Logo

LG MS-2645DPA - Component Test Procedure

LG MS-2645DPA
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-8
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS TEST PROCEDURE RESULTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
1. Measure the resistance.
(Ohm-meter scale: Rx1)
Primary winding
Secondary winding
Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
Primary winding to ground
Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
Between Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
Filament to chassis
Approx.: 1.4
Approx.: 90
Less than: 0.1
Normal:
Normal:
Normal: Less than 1
Normal:
PRIMARY
TERMINAL
SECONDARY
TERMINAL
WINDING
FILAMENT
TERMINAL
COMPONENT TEST PROCEDURE

Related product manuals