2-10
Copyright © 2020 LG Electronics Inc. All rights reserved.
Only for training and service purposes.
1. Insert FFC Cable_Pick Up into Connector_Pick Up until it is no longer inserted vertically.
(Also, insert FFC Cable_Loading into Connector_Pick Up with the same disinfection.)
2. Insert as shown in 1 and check the FFC Cable Line level of A based on B.
(A and B do not always match. )
MD FFC INSERTION GUIDE
FFC Cable_Pick UP
Connector_Pick Up
FFC Cable_Loading
Connector_ Loading
A : FFC Cable Line
B : Connector
Case 1 : OK Case 2 : NG
))&/LQH
))&/LQH
&RQQHFWRU
&RQQHFWRU
))&/LQH
))&/LQH
&RQQHFWRU
&RQQHFWRU