EasyManua.ls Logo

LG Therma V HU121 U33 - Foundation for Installation

LG Therma V HU121 U33
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
THERMA V Split Type
10. Installation
44
Outdoor unit
10.5 Installation of outdoor units
10.5.1 Foundation for Installation
Check the strength and level of the installation ground so that the unit will not cause any operating vibration
ornoise after installation.
Fix the unit securely by means of the foundation bolts. (Prepare 4sets of M12 foundation bolts, nuts and
washerseach which are available on the market.)
It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.
WARNING
10.5.2 Evacuation
1. Connect the charge hose end described in the preceding steps to the vacuum pump to evacuate the tubing and
indoor unit. Confirm the "Lo and Hi" knob of the manifold valve isopen. Then, run the vacuum pump. The
Be sure to remove the Pallet(Wood Support) of the bottom
side of the outdoor unit Base Pan before fixing the bolt. It
may cause the unstable state of the outdoor settlement, and
may cause freezing of the heat exchanger resulting in
abnormal operations.
Be sure to remove the Pallet(Wood Support) of the bottom
side of the outdoor unit before welding. Not removing
Pallet(Wood Support) causes hazard of fire during welding.
950
390
360
614 165
[Unit:mm]
Foundation bolt executing method
200
Nut
75
75
200
Spring washer
Frame
Anti-vibration
materials
Four bolt are
required
3 thread ridges
H-Beam
Concrete
base
100
[U4 Chassis]
Pallet(Wood Support)
- Remove before Installation

Related product manuals