EasyManua.ls Logo

Made MEIKO User Manual

Made MEIKO
15 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
MEIKO
Meiko King Size Bed with Drawer
Storage
Meiko King Size Bed with Drawer Storage MK 2 20200226
Made In China
Recommendations for the contin-
ual safe use of this product are stated
on the final page of these instructions.
Please retain for future reference.
Les conseils d'utilisation de ce
produit sont indiqués sur la dernière
page de ces instructions. Veuillez les
conserver pour vous y référer si besoin.
Aanwijzingen voor veilig gebruik
van dit meubel worden toegelicht op
de laatste pagina van deze instructies.
Bewaar deze folder goed.
Auf der letzten Seite dieser Anlei-
tung findest du Hinweise für eine
langfristig sichere Anwendung dieses
Produktes. Bitte bewahre sie gut auf.
Las recomendaciones para el uso
continuado de este producto figuran
en la última página de estas instruc-
ciones. Por favor, consérvalas para
futuras consultas.
FR
NL
DE
ES
CB
Question and Answer IconNeed help?

Do you have a question about the Made MEIKO and is the answer not in the manual?

Made MEIKO Specifications

General IconGeneral
BrandMade
ModelMEIKO
CategoryIndoor Furnishing
LanguageEnglish

Summary

Assembly Tools and Hardware Overview

Main Frame Construction

Step 1: Initial Frame Preparation

Assemble the first frame components using specified hardware like screws and dowels.

Step 2: Connecting Frame Sides

Attach side panels to the base frame using screws and dowels for structural integrity.

Step 3: Reinforcing Frame Structure

Secure crossbars and supports to the main bed frame using appropriate fasteners.

Step 4: Attaching Longitudinal Supports

Connect central support beams to the main frame for added stability.

Step 5: Securing Drawer Runners

Mount drawer runner brackets onto the interior sides of the bed frame.

Step 6: Final Frame Assembly

Complete the main bed frame by attaching any remaining structural parts.

Central Support and Slat Installation

Step 7: Installing Middle Support Beams

Fit and secure the central horizontal support beams within the frame.

Step 8: Placing the Slatted Base

Position and install the wooden slats onto the frame for mattress support.

Drawer Unit Assembly

Step 9: Drawer Box Construction

Assemble the individual drawer boxes using panels and hardware provided.

Step 10: Drawer Base Insertion

Install the drawer bases into the assembled drawer boxes.

Final Assembly and Product Specifications

Step 11: Inserting Completed Drawers

Slide the finished drawer units into the main bed frame.

Product Specifications and Dimensions

Overview of bed dimensions, weight limits, and overall size.