EasyManuals Logo
Home>Mahindra>Front End Loaders>ML104 Series

Mahindra ML104 Series User Manual

Mahindra ML104 Series
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
Form 1503-1067 Page 2 of 11
LOADER INSTALLATION
STEP 1. Install Valve Stand to Right Hand
Rear Mount as shown using one (1) 1/2” x 1
1/2” bolt, 1/2” flat washer, 1/2” lock washer
and 1/2” hex nut in slot and one (1) 1/2” x 1
1/2” bolt, 1/2” lock washer and 1/2” hex nut
in round hole.
Form 1503-1067 Page 3 of 11
STEP 2. Install Hydraulic Control Valve to
Valve Stand using one (1) 5/16” x 3/4” bolt
and 5/16” lock washer in top left hole and
two (2) 5/16” x 3/4” bolt, 5/16” lock washer,
and 5/16” flat washer in bottom left slot and
right slot.
Attach Single Lever Control (SLC) w/ regen
decal to back of valve stand as shown
insuring float position detail is on top.
STEP 3.
Attach a female quick coupler to
all four hydraulic ports indicated in the
figure. Mark the quick couplers with
colored nylon ties as shown:
1. Red - Bucket Cyl. Rod End
2. Yellow – Bucket Cylinder Base End
3. Blue – Lift Cylinder Rod End
4. Green – Lift Cyl. Base End.
3
2
4
1
16 Series, Model - 2816

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mahindra ML104 Series and is the answer not in the manual?

Mahindra ML104 Series Specifications

General IconGeneral
BrandMahindra
ModelML104 Series
CategoryFront End Loaders
LanguageEnglish

Related product manuals