EasyManua.ls Logo

Mainstays Parsons - Step 3: Support Grid Leg Installation; Step 4: Placing the Support Grid

Mainstays Parsons
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 3
Attach the Grid Support Legs Uning 2 M6 JC . Attach the Grid Center Support Leg
using 4 m6JCB Provied. One Atttached tighen all JCB using the M^ Allen Key
provided.
Step 4
With the help of another person place the assembled support grid into the angled
support on each side rail.