EasyManuals Logo

Marineland ML Series User Manual

Marineland ML Series
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
6
INSTALLATION
Tank Preparation
1. Locate unit near a 110–120 volt grounded
outlet with a 15 amp dedicated circuit.
2. Make sure Vented Panel is not obstructed.
These panels allow cooling air to reach
compressor.They also provide access to
filters,thermostat,on/off switch,drains and
other components.
3. Unpack all accessories,supplies and Upper
False Bottom from tank.
WARNING: Do not attempt to operate unit on
extension cord or non-grounded circuit.
Do not handle or connect plug with wet hands.
The following simple steps are required to get your system up and
operational. Consult exploded views for any necessary clarification.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Marineland ML Series and is the answer not in the manual?

Marineland ML Series Specifications

General IconGeneral
BrandMarineland
ModelML Series
CategoryMonitor
LanguageEnglish