EasyManua.ls Logo

Master Marvin - SET-UP PREPARATION; Unfold the board from the packaging; Valve operation

Master Marvin
33 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
SET-UP PREPARATION
1. Unfold the board from the packaging.
Choose a smooth and clean surface to unfold board. Roll out the SUP
board until it is laying flat with top side facing up.
2. Valve operation
Follow the instructions below for valve operation and correct
inflation and deflation procedures.
The boards inflation valve is located near the nose of the board. To
close off the valve for inflation, make sure that the center valve pin is
in the “UP” position. If it is in the “DOWN” position, press the valve
pin to “UP” position.
To open the valve for deflation, press down on the valve pin (need
not to turn it), make sure that the center valve pin is in the “DOWN”
position,
Be careful of any sand or debris around the valve area when

Related product manuals