EasyManua.ls Logo

Master Marvin - Fin installation; Inflation tips and precautions

Master Marvin
33 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
15psi for this product.
e. After inflation, tighten the valve cap. Only the valve cap can
ensure final air tightness.
4. Fin installation
The two side fins are fixed on the product. Once the board is inflated,
slide in the middle fin to the base and insert the fixed pin.
5. Inflation tips and precautions
DO NOT use an air compressor. Damage to your board caused by over
inflation from an air compressor is not covered by our warranty.
After 2 or 3 days there may be a small decrease of pressure due to
temperature change . if so, add a few pumps of air.
Before undertaking a long paddle, inflate the board for a full 24 hours
to make sure the board is airtight. If you are seeing a consistent
decrease in air pressure, follow the instructions for leak detection in
the board repair section of this manual.

Related product manuals