EasyManua.ls Logo

Matweld 05000 - Operation; Pre-Operation Setup; Shearing Procedure; Blade Retraction Sequence

Matweld 05000
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
MATWELD, INC. PHONE:(270) 444-0085 FAX:(270) 443-6180
Matweld reserves the right to change parts, features, or specifications without notice.
10/09
05000 HAND PUMP WELD SHEAR
MODEL NO: 05000
PRESSURE: 2000 PSI (140 BAR)
OPERATION:
PLACE THE SHEAR ON THE RAIL PRIOR TO SETTING UP THE WELD TO ADJUST THE
HOLD DOWN LEGS. AFTER HOLD DOWN LEGS ARE ADJUSTED, REMOVE SHEAR
FROM RAIL TO PREPARE WELD.
1. WHEN THE WELD IS READY TO BE CUT, TWO PEOPLE, ONE ON EACH SIDE OF THE
SHEAR SHOULD CAREFULLY PLACE THE SHEAR OVER THE WELD AND LOCK IT INTO
PLACE WITH THE HOLD DOWN LEGS.
2. TO SHEAR, ROTATE VALVE HANDLE CLOCKWISE TO STOP POSITION AND WITH ONE
PERSON ONLY OPERATING THE PUMP HANDLE, PUMP THE HANDLE BACK AND FORTH
TO CLOSE. NOTE: IMMEDIATELY RETRACT THE BLADES AFTER THE CUT IS MADE TO
PROLONG BLADE LIFE.
3. TO RETRACT THE BLADES, ROTATE THE VALVE HANDLE COUNTERCLOCKWISE TO
STOP POSITION AND ACTIVATE THE HANDLE BACK AND FORTH. AFTER THE CUT HAS
BEEN MADE, AND THE BLADES RETRACTED, RETURN VALVE TO THE CENTER OR
“NEUTRAL” POSITION.
4. TO REMOVE SHEAR FROM THE RAIL, LOOSEN HOLD DOWNS, POSITION 2 PEOPLE,
ONE ON EACH SIDE OF THE SHEAR AND CAREFULLY REMOVE FROM THE RAIL.