EasyManua.ls Logo

MAZ 631236 - Page 27

Default Icon
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Job list of the presales preparation
1 Brining back into service (disposal of the antirust compound).
2 It is necessary to make sure that the product doesn’t have any damages it is necessary to
check the accessories, the instruments, the instructions in accordance with the packing list.
3 It is necessary to remand demounted for handling time articles and accessories.
4 It is necessary to check the oil presence and level in the aggregates and products units, and
add some if necessary.
5 It is necessary to add cooling liquid.
6 It is necessary to check the state of the accumulator batteries, their fastening (add
electrolyte, recharge and fix in case of need)
7 It is necessary to check good work conditions of the air brakes, clutch drive, electric
accessories, signals, cabin dumping system, tire pressure, wheel fastening and of the other links.
8 It is necessary to check good work conditions of the aggregates, of the products systems and
to eliminate damages in case of need.
9 It is necessary to check the work of the steering gear when the engine is running and to
eliminate damages in case of need.
10 It is necessary to check the product at the bottom (the absence of the cooling liquid, oil and
fuel leak and junction reliability).
11 It is necessary to clean the product and refresh the paint.
12 It is necessary to give instructions to the holder, driver.