139
Operation
5
Hitch Operation
OPERATION1
LowerthelowerlinksandsetforRigidorFloatapplica-
tion,asrequired.
OPERATION2
Attachtheimplementtothehitch.Makesurethe
correctcategoryimplementisattached.Acategory
indicationisstampedoneachlowerlink.
Makesuretheclawsonthefronthitchengagewiththe
implementandthelatcheslock.
OPERATION3
Movetherelevantremotecontroltoraiseorlowerthe
hitchasrequired.
(Exceptfurtherapplicationswhenthetractorisequipped
withafrontloader).
Front Ballast
Onrequest,afrontballastkitonthefrontpowerliftis
available.
WARNING: Use suitable lifting means when
handling the ballast.
WARNING: When servicing work is requi-
red, lower the front lift to the ground and
unhitch the implement. NEVER carry out
servicing work by standing under the front
lift.
Optional Equipment
Front Hydraulic Quick Couplers for Remote
Valves (available as a kit)
IMPORTANT: The front remote couplers are supplied
from one of the rear remote valves. DO NOT use both
the front and the corresponding rear remote couplers at
the same time.
WARNING: Stand well clear of the linkage
or implement when operating the external
controls or injury can result from contact
with moving parts. Watch for possible pinch
points between the implement and tractor
when the hitch is moved.