■■■■■■■■■■■■■■■■■■■■■■
3 Installation
IC equipment: Inline-Ultrafiltration
■■■■■■■■
9
■ Place the sealing ring back in the recess.
■ Using the tweezers, place the wet filtration membrane centrally
inside the sealing ring onto the cell.
7
Assembling the ultrafiltration cell
■ Place the upper chamber of the ultrafiltration cell on the lower
chamber in such a way that the 2 guide bolts exactly fit into the 2
bore holes.
8
Screwing the ultrafiltration cell together
■ Screw the 5 screws with the washers in the ultrafiltration cell by
hand first.
■ Then firmly tighten them with the hex key in crosswise sequence.