28
Installation & Maintenance Manual
5-2 Disassembly of indoor unit
Release the bottom edge of indoor unit from the mounting plate.
Use Allen wrench
In case the method in left column cannot be taken
As shown in Figure below, use Allen wrench to  pull 
downward the bottom edge of  indoor unit, and then pull
out the unit slight so as to release the bottom buckles;. 
If the method cannot be  taken, just remove the face  plate. 
As shown in Figure below, insert the  allen wrench into 
the left and right square  openings; and then push the
allen wrench upward so as  to descend the indoor unit,
     Insert the Allen 
wrench, and hook the end.
Allen wrench (4cm) 
Square opening
Push
Downward
5-3 Refrigerant replenishment 
Detailed operation steps are listed as follow:
Align and connect the gas bomb onto access door of gas valve;
Carry out the air purge for pipeline (or hose) from gas bomb of refrigerant;
Replenish refrigerant of specified volume for normal operation of the air conditioner.
Connecting pipe
Indoor unit
Shutoff valve
Outdoor unit
Liquid pipe
Gas pipe
Charging hose
Access door
(R-22 liquid ) charging
Spring balance
Charging bottle
of coolant
Operation valve of
gas bomb for coolant
Note:
Pipe length (m)
Refrigerant replenishing
 volume for  unit(g)
If connecting pipe length is over 7m, refrigerant replenishment is required. 
Refrigerant replenishing volume for cooling/heating unit are listed as follow: A = 15g/m * (L-7) . 
 (A in the formula indicates the refrigerant replenishing volume in g; L indicates connecting pipe length in m) 
Note: maximum length of connecting pipe for models 25 Series must not be longer than 10m, and the maximum 
length of connecting pipe for models 35/50/70 Series must not be longer than 15m. 
1. During charing operation, do not turn over the gas 
bomb for refrigerant replenishing for fear of any 
problem;
2. To keep the high pressure in the gas bomb, please 
heat it by warm water (40 ) in cold seasons. Do not 
put it on fire, or heat it by hot steam.
VI. Installation instructions