EasyManua.ls Logo

Mikado LOGO 800 - 6 Torque Tube; Torque Tube Assembly

Mikado LOGO 800
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
2
3
4
5
Torque Tube assembly
Carbon tail rotor push rod
Bag 8 + 12
10 mm Shrink tubing 10 mm Shrink tubing 10 mm Shrink tubing10 mm Shrink tubing
Push the four ball bearing mounted plastic sleeves to the torque tube, use the 10 mm adhesive shrink tubing to hold the bearings in position.
Please ensure prior to inserting the torque tube that the tail boom is dirt-free
inside. If necessary clean it with a cloth.
Please apply a good amount of grease to the rubber o-rings and to the inside of
the tail boom before inserting the torque tube assembly into the tail boom.
Apply grease to the o-rings.
Sand the carbon
tube before glueing
the ball link adapters
in place.
Shrink tubing
Manual LOGO 800 - ©Mikado Model Helicopters GmbH -
Page 11
6 Torque Tube
280mm 250mm
180mm
120mm
70mm
5 min Epoxy
5 min Epoxy
2x
2x
2x
2x M3
M3x16
3mm
M3x16
M3x16

Related product manuals