EasyManua.ls Logo

MIMAKI CJV150-107 - Chapter 6: PCB and Hardware Error Messages; PCB and Internal Clock Errors; Head and Motor Control Errors

MIMAKI CJV150-107
299 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2014 MIMAKI ENGINEERING CO.,LTD.
4.3.9 P.3
4.3.9 Parallelism adjustment of the Tension Bar
1
2
3
4
5
6
7
8
5. Drape the wire vertically and affix it to the platen cover FL
using tape.
6. Attach a piece of tape (the first tape) to the wire.
7. With the wire tense, wrap the wire around the T bar 160 once.
8. Pull the wire around the roll shaft.
9. Pull the wire to the platen cover FL, going around the T bar
160.
Tape
Platen cover FL
Wire
Apply tension appropriately to the wire.
First tape
Wire
First tape
Wire
T bar 160
Be careful not to raise the T bar due to the tension of
the wire.
Wire
Platen cover FL
T bar 160
Roll shaft
R.1.0
MAINTENANCE MANUAL > Adjustment Items > Mechanical Adjustment > Parallelism adjustment of the Tension Bar
Model
CJV150/300
Issued
2014.09.15
Revised F/W ver.
1.00
Remark
1.0
Rev.

Table of Contents

Other manuals for MIMAKI CJV150-107

Related product manuals